December 2015
Succeeded in emitting the 28GHz ECR beam
December 2016
Succeeded in the RFQ beam emitting test
2
June 2016/December
Constructed the SRF (superconducting radio frequency) testing facility
3
October 2017
Succeeded in the SCL demo beam emitting test
4
October 2017
Succeeded in the performance test of the prototype of SCL3 superconducting accelerating module (QWR)
5
March 2018
Succeeded in the performance test of the prototype of SCL3 superconducting accelerating module (HWR)
6
September 2018
Succeeded in developing the prototype of IF system high-temperature superconducting four-pole electromagnet
7
December 2018
Completed the creation of the LAMPS high-energy neutron detector system
8
December 2018
Performed the characteristic assessment of the ISOL target/ion source (TIS) system and completed the creation of the final product